Texas School for the Deaf
|
(Main Campus Additions and Sidewalk Improvements)
Construction of four (4) new buildings, renovation of seven (7) existing buildings, associated with the utilities, paving, parking and drainage improvements. Upgraded the entire water and wastewater system within the approximately 80 acres campus.
Completion Date: 2004 Construction Cost: Approximately $32 Million
|
Austin Independent School District
|
|
Nan Clayton Elementary School
New school with a 91,960 sq. ft. building, access and circulation drives, parking, sidewalks, plays cape and play field areas, and water quality improvements.
Completion Date: 2006 Construction Cost: $12.5 Million
|
|
Overton Elementary School
Development consists of a new elementary school and a new recreation center with the associated roadway, parking, driveway, water, wastewater and drainage improvements.
Completion Date: 2008
Awarded: United States Green Building Council Balcones Chapter 2009 Green School Award
|
|
Timy Baranoff Elementary School
New school with an approx. 60,000 sq. ft. building, a playing field, jogging trail, playgrounds, and 90 parking spaces.
Completion Date: 1999 Construction Cost: $6.2 Million
|
| Kealing Middle School Addition
Renovation of existing main building and construction a new two-story building. Proposed new building will include Library/Media Center and 16 classrooms, including 3 science classrooms/labs.
Completion Date: August, 2007
Awarded: Austin Energy Green Building - 4 Star Rating
|
| Kiker Elementary School
Building expansion include the addition of eight classrooms and also the removal of several of the portable buildings.
Completion Date: July, 2007
|
| Crockett High School
Existing library expansion. The new building addition consisted of 7,770 sq. ft. with the sidewalk, grading, drainage, water and wastewater improvements.
Completion Date: 1999 Construction Cost: Approx. $1.0 Million
|
| Fulmore Middle School
New building for laboratories and classrooms. Site improvements included grading, drainage, detention pond, water and wastewater. Completion Date: October, 2000 Construction Cost: $1.0 Million
|
Austin Independent School District Small Projects / Site Drainage and Accessibility Improvements:
|
Akins High School Greenhouse Alternative Learning Center Cunningham Elementary School Johnston High School Murchison Middle School Porter Middle School
| Akins High School Fine Arts Building Blackshear Elementary School Future Farmers of America Agricultural Farm Jordan Elementary School Norman Elementary School Widen Elementary School
| Akins High School Cafeteria Bldg Campbell Elementary School Hill Elementary School Kocurek Elementary School Oak Hill Elementary School Zavala Elementary School
|
Del Valle Independent School District
|
| Baty Elementary School
New elementary school improvements included streets, drainage, two detention ponds, two water quality ponds, site grading, water and wastewater.
Completion Date: 1998 Construction Cost: 7.9 Million
|
University of Texas at Austin
|
Whitaker Field at Waller Creek
Bank stabilization for three most severely eroded areas along the west bank of Waller Creek within the University of Texas (UT) Whitaker Field property boundary. In addition, RC&A prepared a Master Erosion Plan for the Waller Creek along Whitaker Field. This stretch of Waller Creek spans from 47th Street at the downstream end to 51st Street at the upstream end in Austin, Texas. It consists of approx. 1,800 feet of stream length. Completion Date: On-Going Construction Cost: Phase 1 - $380,000 Phase 2 - $1 Million (estimated)
|
University of Texas Library Storage Building Addition
Add approximately 55,000 square feet of new storage area for the existing UT Library Storage Building in the J.J. Pickle Research Center in Austin.
| T.S. Painter Hall Wastewater Line Improvements
Wastewater line improvements from Painter Hall building to an existing manhole located on West 24th Street. The proposed wastewater line improvements consist of approximately 80 lineal feet.
|
|